OVERVIEW

Kallam Transmission Limited (“KTL”) was incorporated on May 28, 2020. Kallam Transmission Limited entered into a TSA dated September 30, 2021, with the Long-Term Transmission Customers. The letter of intent for development of Kallam Transmission Limited was awarded to consortium of IGL1 and IGL2 (“IndiGrid Consortium”) by the REC Power Development and Consultancy Limited on November 30, 2021, for a 35-year period from the scheduled commercial operation date, on a Build, Own, Operate and Maintain model. IndiGrid Consortium acquired the project on December 28, 2021. The asset was operationalised by IndiGrid Consortium in Q4 FY2023-24.

Kallam Transmission Limited In The Grid

Kallam Transmission Limited is a crucial project for evacuation of renewable energy to the extent of 1 GW from the Osmanabad region of Maharashtra. The asset consists of a 1000 MVA substation in Kallam region with an interlinking multi circuit transmission line of ~18 kilometers with a line in line out of both circuits from the 400 kV double circuit Pune- Parli transmission line.

Details of KTL’s project elements are set forth as follows:

Project element ROUTE LENGTH (CKMS) Substation capacity (MVA) SPECIFICATIONS COMMISSION DATE EXPIRY TERM OF TSA
Kallam substation - 1,000 2x500 MVA, 400/220 kV 8 line bays (4x 400 kV, 4x220 kV) 4 ICT bays (2x400 kV, 2x220 kV) Q4 FY24 June 2058
LILO line at Kallam PS ~18 - Multicircuit line, LILO of both circuits of Parli(PG) – Pune(GIS) 400kV D/c line Q4 FY24 June 2058